Aeronautical Engineers has signed a deal  to provide GA Telesis with up to two B737-800SF freighter conversions. The order includes one firm aircraft with an option for a second aircraft.

The first aircraft (MSN 32903) will commence modification in August 2020 and will be performed by Commercial Jet in Miami, FL. If exercised, the option aircraft will commence modification in early 2021.  T

The AEI converted B737-800SF freighter offers a main deck payload of up to 52,700 lbs. (23,904 kg) and incorporates eleven full height 88” x 125” container positions, plus an additional position for an AEP/AEH.

The conversion also incorporates new floor beams aft of the wing box, a large 86” x 137” Main Cargo Door with a single vent door system, and a flexible Ancra Cargo Loading System. Additionally, the AEI B737-800SF includes a rigid 9g barrier, up to five supernumerary seats, a galley and full lavatory.